Job card software for printing and packaging factories
ENOMI's job card software is built for printing and packaging factories. The job card is designed to be made from the sales order and to carry the artwork revision, die, plate, machines, stages and wastage, and to print as a PDF for the floor. Job cards are planned, not released yet.
Screens on this page show sample data. ENOMI is planned to run beside Tally.
- Customer
- Sample Customer
- Item
- Shipper box, 3 ply B flute
- Size
- 420×310×260 mm
- Quantity
- 5,000 boxes
- Deliver by
- 12 Sep 2026
- Artwork
- ART-2214 rev 3
The planner chooses
- Reelto choose
- Dieto choose
- Plateto choose
- Machinesto choose
Built to put the floor instructions on one job card
This workflow is planned, not released yet. One card per job. The order details are carried from the sales order, and the rest is added by the planner and the operators as the job moves. Nothing is kept in a separate sheet.
The order
Customer, item, size, quantity and delivery date, carried from the sales order.
Artwork revision
The revision the customer approved. Older revisions stay in the record, marked superseded.
Die and plate
The die and the plates for this job, each with its number and its rack.
Machines and stages
Each stage tied to a machine, with the operator and the time when it is closed.
Quantities and wastage
Sheets in, good sheets out and wastage at every stage, and the total for the job.
Quality check
The first-off and final readings, and who released the run. A failed check holds the work.
For the whole plant view, with reels, cartons and labels, see corrugated box ERP for packaging manufacturers.
What this is not
This planned workflow is for a print and pack floor. It is not for garages or service workshops.
Fields on a planned printing and packaging job card
These invented values illustrate the planned record, not a released screen or a customer job.
| Field | Sample value |
|---|---|
| Artwork revision | ART-104 rev 3 |
| Die | D-208, rack A2 |
| Plate | P-310, rack B4 |
| Stage | Printing, press 2 |
| Wastage | 40 sheets from 2,000 input; 1,960 good sheets |
Planned artwork revision, die and plate on the job card
This workflow is planned, not released yet. A job printed on the wrong plate is a job lost. The card names the revision the customer approved, and the die and plates are looked up from stock, so pre-press and the press room read the same record.
Artwork ART-2214
- Rev 1superseded
First proof
12 Aug 2026
- Rev 2superseded
Barcode added, logo moved
19 Aug 2026
- Rev 3printing
Approved by the customer
26 Aug 2026
Die and plates
- DIE-0418In use
Die for 420×310×260 shipper, flatbed
Rack D3
- PL-2214Mounted
Flexo plates, 2 colour, made for rev 3
Press 1
- PL-2201Withdrawn
Flexo plates made for rev 2
Rack P1
The job card names rev 3. A plate made for rev 2 is marked withdrawn, so anyone can see which plate is current.
On the card
- The approved artwork revision is named on the job card. When the customer approves a new one, the card shows it.
- A plate made for an older revision is marked withdrawn, so nobody mounts it by mistake.
- The die has a number and a rack, so the floor knows where to fetch it.
Planned machines and stages, closed by the operator
This workflow is planned, not released yet. Each stage of the job is tied to a machine. The floor sees what is running and what is waiting at each machine, and an operator closes a stage with the good quantity out.
- Corrugator 1JOB-221938%JOB-2224
- Flexo press 1JOB-221462%JOB-2219
- Flatbed die-cutterfreeJOB-2214JOB-2209
- Folder gluerJOB-220980%
Highlighted is running. The others are waiting at that machine. JOB-2214 is printing and will go to the die-cutter next.
- Sheets in come from the stage before, nobody types them
- Wastage is worked out from the two figures
- Saved with the name of the operator and the time
Who decides what
- Your planner decides which job goes to which machine and in what order. ENOMI shows that plan to the floor and does not change it.
- The next stage can start from the good quantity of the stage before it.
What the operator enters
- Good quantity out, when the stage is closed. The quantity in comes from the stage before.
- The name and the time are saved with it, and any later change is recorded.
Planned quantities in and out, and wastage by stage
This workflow is planned, not released yet. A total wastage figure at month end tells you that you lost material, not where. With a figure at every stage, you can see which machine, which job and which stage is losing it.
2 ups: two blanks across the 1,180 mm sheet, so each sheet gives two boxes. The count is in sheets until die-cutting, then in blanks and boxes. Job wastage is 240 of 5,240 boxes' worth.
Boxes shipped
5,000
Stage wastage
240 boxes' worth
Trim waste
30 mm of 1,180 mm, 2.5%
What you can read from it
- Sheets in, good sheets out and wastage for each stage and for the whole job.
- Trim waste, the strip left at the side of the reel, beside the reel width.
- The boxes shipped, which are the boxes that go on the challan and the invoice.
Planned quality checks on the job card before the run
This workflow is planned, not released yet. The first sheets off the press are checked before the run starts, and the readings stay on the job. The person who released the run is named.
- Artwork revision on the plateRev 3Rev 3 on the cardPass
- Colour against the approved sampleMatchesMatchesPass
- Registration0.3 mmup to 0.5 mmPass
- Board on the sheet3 ply, B fluteas on the cardPass
Decision
Run released to full speed
Checked by
P. Shetty · 31 Aug 10:12
How the checks work
- A first-off check before the run, readings during the run, and a final check before dispatch.
- A check that fails holds the stage or the goods where they are.
- Only goods that passed the final check can go on a challan.
How the job card is designed to link stock and costing
This workflow is planned, not released yet. The job card is not a separate sheet beside your stock. When the work happens, stock moves, and the job shows what it took and what it gave back.
Material issued to the job
- R-88421Kraft liner 150 GSM, BF 22 · outer
- Issued
- 1,240 kg
- Used
- 693 kg
- Back to stock
- 547 kg
- R-88419Kraft liner 150 GSM, BF 22 · inner
- Issued
- 1,100 kg
- Used
- 693 kg
- Back to stock
- 407 kg
- R-88418Fluting 120 GSM
- Issued
- 1,000 kg
- Used
- 832 kg
- Back to stock
- 168 kg
Reel used by the job
2,218 kg
Wastage, all stages
240 boxes' worth
Good boxes into stock
5,000 · bin FG-02
Stock
- A reel issued to the job comes off stock. The balance of a part-used reel goes back.
- When the last stage closes, the good boxes come into stock in their bin, with the job number.
Costing
- The books value the material issued at the cost of the stock, so the job shows its material cost and the material lost as wastage.
- ENOMI does not spread labour, power or machine charges over jobs.
The planned job card PDF for the shop floor
This workflow is planned, not released yet. The floor still likes paper. The job card prints as a PDF made from the job itself, so the paper cannot differ from the screen.
- Customer
- Sample Customer
- Order
- SO-3308 · line 1
- Item
- Shipper box, 3 ply B flute
- Size L×W×H
- 420×310×260 mm
- Quantity
- 5,000 boxes
- Deliver by
- 12 Sep 2026
- Reels
- R-88421, R-88419 · R-88418
- Deckle
- 1,180 mm · 2 ups
- Artwork
- ART-2214 rev 3
- Die
- DIE-0418 · Rack D3
- Plate
- PL-2214 · 2 colour
- Released by
- S. Kamath
Sample data: the printed job card
On the paper
- The order, the item, the size and the delivery date.
- The reel, the artwork revision, the die and the plate.
- Every stage with its machine, and boxes to write the quantities in and out.
- The name of the person who released it, and the time it was printed.
What the operators write on the paper is entered on the screen when the stage is closed. A card printed after a change shows the current artwork revision.
What is planned for the ENOMI job card
This workflow is planned, not released yet. What a job card in ENOMI covers when we set it up, and what it leaves out.
What we set up first
- A job card made from the sales order, with the artwork revision, die, plate, reel and machines.
- Stages tied to machines, closed by the operator with the name and the time.
- Quantities in and out and wastage for every stage, and trim waste for the job.
- First-off, in-process and final quality checks, with a hold when one fails.
- Stock issues and returns, finished goods into stock, and the job card as a PDF.
Later, or not ENOMI's job
- ENOMI does not plan your machines. Your planner chooses the order, and ENOMI records it and what happened.
- Quantities are entered by your operators. ENOMI does not read them from production machines.
- Labour, power and machine charges are not spread over jobs. The material cost and wastage are.
Trucks and weights are handled at the gate. See weighbridge software that feeds your ERP, and read ENOMI vs Tally if you wonder whether your Tally books are enough. For outside processing, review the planned job work dispatches and returns. Follow issued material through the planned stock movement ledger.
Questions about planned job card software
What is planned for ENOMI job card software?
Job card software gives a factory a card for each production job. ENOMI is designed to make it from the sales order with the artwork revision, die, plate, stages and wastage. Job cards and their links to stock, quality and dispatch are planned, not released yet.
Is the job card designed to start from a sales order?
The job card is built to start from a sales order line, carrying its item, quantity, delivery date and approved artwork revision. The planner would then choose materials, tooling and machines. Job cards are planned, not released yet.
How is tooling planned to appear on the job card?
The job card is designed to name the approved artwork revision and the die and plate to use. Revision history, withdrawn plates and rack records are planned alongside it. Job cards are not released yet.
How does ENOMI record stages, machines and quantities?
Production stages are planned to record a machine, good quantity out, wastage, operator and time. ENOMI is designed to carry the input quantity from the previous stage. These features are not released yet.
How is wastage planned to appear on the job card?
The job card is designed to show quantities in, good output and wastage by stage, with trim waste beside the reel width. Job cards and production stages are planned, not released yet.
Is the job card designed to link stock and costing?
The job card is designed to link material issues, returns and finished goods to stock. Material costing is planned; labour, power and machine allocation are outside this proposed scope. Job cards and these stock links are not released yet.
Is a job card PDF planned for the shop floor?
The job card PDF is planned to use the job record, including the order, approved artwork revision, die, plate, machines and spaces for stage entries. It is designed to show the revision and print time. Job cards and PDF output are not released yet.
Is it only for packaging, or for other factories too?
Job cards are planned first for printing and packaging factories. Other trades would be set up after studying the floor and agreeing the scope. This is not intended for garages or service workshops; job cards are not released yet.
Last updated
Talk to the founders about your print and pack floor
Call, message or email Vedant or Vishal. We start with your factory floor and what slows it down, not with slides.